THE MISSION
REQUIREMENT.
A forward operating base needs 48-hour persistent ISR coverage of a 2,400km² border sector. Weather grounds manned aviation. MANPADS threat eliminates rotary wing. The requirement lands on a contracting officer's desk at 0200.
↳ RCN-7X PHANTOM: $320/HR — 98.3% COST REDUCTION
THE ENGINEERING
RESPONSE.
Every requirement drives a design decision. Every tolerance is documented. The RCN-7X Phantom was engineered against the hardest operational constraints in the requirements document — not the easiest.
Triple-redundant INS with terrain-referenced navigation. Operates in full GPS denial environments. CEP < 15m after 48hr flight without satellite correction.
MEASURED
OUTCOMES.
Numbers from 847 operational sorties across 6 deployed theaters. These are not manufacturer claims — they are after-action report aggregates submitted by program offices.
INITIATE
CONTACT.
Program managers and contracting officers receive a tailored mission brief within 48 hours. Field commanders can reach our forward support team directly.
For classified discussions, contact your Recon program liaison through secure channels.
